Nuralite re-roof               hover your mouse curser over the photo for the text

Remove existing Nuralite roof membrane and replace with 2 layer mechanically fixed Imper Torchon System with new parapet wall flashings.

 main roof existing Nuralite, heavy lichen growth main roof north side
annex roof, leaking stair access
stair roof is full bonded, torched to bleed bitumens up for adhesion of underlay underlay applied to stair roof
black mineral applied to stair roof nuralite removed from annex roof and underlay fitted
fixing the underlay with scie washers and screws applying the black mineral cap sheet with the dragin wagon
black mineral field area completed and ready for upstands torch work completed ready for metal wall flashings
main roof early in the morning, fog in the background tearing up the nuralite roof
applying new stainless steel screws to existing plywood sheets , the nail heads had rusted off torching the laps of the underlay and laying out the scie washers
first third of roof completed with underlay and sealed to existing overnight second section of nuralite removed showing the adhesive pattern used to bond the material to the plywood
carrying on with the underlay over the second section, with scie washers along the laps  two thirds of the roof removed and underlay sealed to existing
laying the Black Granule Imper cap layer with the draginwagon  half way
half way  last section being torn up
last pieces being bagged for disposal  fixing the sciewashers to the underlay laps
last section of underlay completed  fixing the last sciewashers to the underlay before the last piece of cap sheet at the high point of the roof
upstand pieces prefolded ready for laying on a cold day  more pieces
torch work completed  cutting the chases for the wall counter flashings
counter flashings installed and applying the sealant to the chase  annex wall flashings completed
roof completed NE corner  roof completed SE corner
roof completed SW corner  roof completed NW corner