DecKing PVC membrane to new plywood substrate, re roof of old asphalt BUR (built up roof), Madras St, Khandallah
              hover your mouse curser over the photo for the text

get a trailer up here?, yeah right the house and deck
old BUR looking west old BUR looking east
end of the internal gutter, a copper box outlet BUR upstand against the wall
low view of the old BUR during the tear off
what a mess old BUR removed and old deck cleaned off ready for new plywood
fitting the new plywood substrate plywood completed and sanded, metal on upstands
inside wall with metal on the upstand to cover residue bitumen (asphalt) internal gutter with metal on the upstand, to cover residue bitumen (asphalt)
 deck is put to bed overnight membrane completed looking east
door step finished with a 90 degree trim over upstand new PVC membrane dressed into copper box oultet over PVC coated drip edge
new PVC membrane dressed against the wall upstand membrane completed looking west
looking back from where all the water is going to end up