G Block Roof Gutters

The Nuralite membrane is showing signs of buckling, which has resulted in some splits in the membrane. These small splits have been repaired with an Aluminium faced self adhesive tape. One or two of the repairs are peeling off at the edges. There is major buckling of the north end of the east side gutter approx 4 metres in from the end.
The ends of the gutters on the south side have been repaired with some kind of bitumen, this is slumping off, perhaps due to thet type of bitumen not being suitable for vertical applications.
These gutters were long overdue for relining, before complete failure took place.

Specification.
Waterblast the surface of the Nuralite to remove moss, leaves and dirt buildup.
Cut out the Nuralite leaving the vertical side under the metal roof in place with a 150mm lap onto the horizontal.
Prime the base and sides of the gutter with bitumen primer and allow to dry.
Apply 3mm thick Index Autotene P Base self adhesive sheet membrane to substrates, lap onto Nuralite upstand step and tuck into groove in precast parapet. Form new stop ends and dress into outlets.
Coat the tie-in of the Autotene/Nuralite overlap with Imper Elastogum fibre reinforced coating, approx 1mm thick x 100mm wide laid in 3 coats.
Coat the entire gutter areas with Imper ElastomulSB UV Resistant, solvent based coating, in 2 coats, Grey colour.
              Hover your mouse curser over the picture to read the text description.
G Block  end of gutter east side has been repaired before, but is slumping off
overall view of east side gutter, slumped area at end, Nuralite buckling in foreground, patches in the centre  close up of Nuralite buckling in previous picture
east side gutter, looking north, some laps have been repaired before  close up of patches in centre of east side gutter
both gutters are waterblasted to remove moss, dirt and anything that may be a fire hazard during application of new membrane  view of east side cleaned
Nuralite membrane removed from timber and concrete substrate  timber and concrete substrates primed with bitumen primer
Autotene membrane laid into sole of gutter  removing the backing and adding another piece of membrane to complete the full girth
Autotene membrane completed and  laps hot trowel welded  close up of membrane tucked up into groove in precast concrete parapet
membrane completed to west side   applying resin and fibreglass tie-in to internal upstand
3 coat tie-in completed  applying first coat of ElastomulSB UV protective paint
first coat of ElastomulBS completed to west side gutter  first coat of ElastomulSB, lower view
west side gutter,looking north  west side gutter,looking south
east side gutter,tearing up nuralite  east side gutter, stripped to substrate
east side gutter,priming substrates  main sheet laid with pieces for the parapet laid out in the sun
east side gutter completed with coating  east side guttercompleted, low view