City Centre Plaza, Lower Hutt Posted 07.06.03 hover your mouse curser over the photo for the text
Level 7
Gutter Linings, Index Fidia Biarmato 3mm Torchon Membrane, laid fully bonded in 3 pieces, to horizontal and vertical bitumen primed plywood substrates.
Level 7 Plant Room Roof
Index Sirio V 3mm Torchon membrane underlay laid fully bonded to bitumen primed concrete substrate, followed by Index Nova Grey Mineral 4mm fully bonded to underlay.
Form to A/C plinths and wall upstands prior to laying main roof, to allow A/C mechanical work and wall cladding fixing work to be carried out without damaging the main roof membrane.
Level 6 and 5
Index Sirio V 3mm Torchon membrane underlay, laid fully bonded to bitumen primed old concrete substrate, with some new plaster screeded falls (slopes) in various areas to enchance water disposal, followed by Index Nova Mineral fully bonded to underlay.
Form wall upstands prior to laying main roof, to allow wall cladding work and painting work to be carried out without damaging the main roof membrane.
Form new Mastic Asphalt Plinths to feet of existing perimeter fence stanchions.
Dress both membranes to plinths and perimeter upstands, pipes and outlets as required.
Level 5a
Index Testudo 25, a 250gram/m2 polyester reinforced Torchon membrane laid fully bonded to bitumen primed old concrete substrate, with some new plaster screeded falls (slopes) in various areas to enchance water disposal.
Form wall upstands prior to laying main roof in Index Nova Grey Mineral, to allow wall cladding work and painting work to be carried out without damaging the main roof membrane.
Form new Mastic Asphalt Plinths to feet of new perimeter fence stanchions.
Dress both membranes to plinths and perimeter upstands, pipes and outlets as required.
Tiles laid in Covercol Ab adhesive by others.
Architects: Peddle Thorpe & Montgomery
Builder: Ebert Construction Ltd
Metal Roofing : Tararua Roofing Ltd
Waterproofing Membranes: Scie Construction Ltd